You reinstall the controller canister into the controller shelf after installing the new HIC.
- Turn the controller canister over, so that the removable cover faces down.
- With the cam handle in the open position, slide the controller canister all the way into the controller shelf.
The following figures are examples of a 2U and 4U controller shelf:
- Move the cam handle to the left to lock the controller canister in place.
- Reconnect all the cables you removed.
Do not connect data cables to the new HIC ports at this time.
- (Optional) If you are adding HICs to the second controller, repeat all steps to remove the second controller canister, install the second HIC, and reinstall the second controller canister.