Gathering the prerequisites
It is the customer’s responsibility to provide the following prerequisite hardware and software:
One 1 GbE top of rack (TOR) switch for connection to the integrated management module (IMM)
Two 10 GbE TOR switches
VMware licenses (if required)
Besides, ensure that the appliance is connected to an ac power source (two power cables per appliance) and in a proper cooling environment.
Give documentation feedback