Skip to main content

System reliability guidelines

Use these guidelines to ensure that the storage expansion node meets the cooling and system reliability requirements.

  • To ensure proper cooling, do not operate the Flex System Enterprise Chassis without a device or filler installed in each bay. See the documentation for your Flex System Enterprise Chassis for additional information.
  • Make sure that the ventilation holes on the storage expansion node are not blocked.
  • The compute node battery must be operational. If the battery becomes defective, replace it immediately. For instructions, see the compute node Installation and Service Guide.