Recovering from a non-controller failure
After the equipment at the disaster site has undergone any required maintenance or replacement, but no controllers were replaced, you can begin the process of returning the MetroCluster configuration to a fully redundant state. This includes healing the configuration (first the data aggregates and then the root aggregates) and performing the switchback operation.
Before you begin
All MetroCluster hardware in the disaster cluster must be functional.
The overall MetroCluster configuration must be in switchover.
In a fabric-attached MetroCluster configuration, the ISL must be up and operating between the MetroCluster sites.
Give documentation feedback