Recovering from a multi-controller or storage failure
If the controller failure extends to all controller modules on one side of a DR group in a four or eight-node MetroCluster configuration, or storage has been replaced, you must replace the equipment and reassign ownership of drives to recover from the disaster.
Before you begin
You should review the available recovery procedures before deciding to use this procedure.
The disaster site must be fenced off.
Switchover must have been performed.
Replacement drives and the controller modules must be new and must not have been assigned ownership previously.
About this task
The examples in this procedure show four-node configurations. If you have an eight-node configuration (two DR groups), you must take into account any failures and perform the required recovery task on the additional controller modules.
This procedure uses the following workflow: