Skip to main content

Cabling worksheet

Use this worksheet to plan for the external network cables to attach the advanced management module and Ethernet switch modules to external networks.

Fill out one worksheet for each BladeCenter S system.

On this worksheet, record:
  1. The BladeCenter S chassis number (1 through 6)
  2. The BladeCenter S chassis location in the rack (starting U through ending U)
  3. The rack number and location
  4. The From port: and To: connections.
Table 1. Cabling worksheet

BladeCenter S chassis number: ___
Location in rack (1 through 5): starts at U ___ and ends at U ___
Rack number and location: ______________________________

ComponentFrom port:To:
Advanced management module (10/100 Mbps)1 
Ethernet switch module - I/O module bay 1.

Fill in the appropriate number of ports based on whether you are using an Ethernet switch module or a copper pass-thru module

1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
Ethernet switch module - I/O module bay 2.

Fill in the appropriate number of ports based on whether you are using an Ethernet switch module or a copper pass-thru module

1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15