What happens during a switchback
After the disaster site has recovered and aggregates have healed, the MetroCluster switchback process returns storage and client access from the disaster recovery site to the home cluster.
The metrocluster switchback command returns the primary site to full, normal MetroCluster operation. Any configuration changes are propagated to the original SVMs. Data server operation is then returned to the sync-source SVMs on the disaster site and the sync-dest SVMs that had been operating on the surviving site are deactivated.
If SVMs were deleted on the surviving site while the MetroCluster configuration was in switchover state, the switchback process does the following:
Deletes the corresponding SVMs on the partner site (the former disaster site).
Deletes any peering relationships of the deleted SVMs.
Give documentation feedback