Solution hardware setup
To set up the solution, install any options that have been purchased, cable the solution, configure and update the firmware, and install the operating system.
- Solution setup checklist
 Use the solution setup checklist to ensure that you have performed all tasks that are required to set up your solution.
- Installation Guidelines
 Use the installation guidelines to install components in your solution.
- Memory module installation order
 Memory modules must be installed in a specific order based on the memory configuration that you implement on your node.
- Install solution hardware options
 This section includes instructions for performing initial installation of optional hardware. Each component installation procedure references any tasks that need to be performed to gain access to the component being replaced.
- Install the enclosure in a rack
 To install the enclosure in a rack, follow the following instructions.
- Cable the solution
 Attach all external cables to the solution. Typically, you will need to connect the solution to a power source, to the data network, and to storage. In addition, you will need to connect the solution to the management network.
- Power on the compute node
 After the compute node performs a short self-test (power status LED flashes rapidly) when connected to input power, it enters the standby state (power status LED flashes once per second).
- Validate solution setup
 After powering up the solution, make sure that the LEDs are lit and that they are green.
- Power off the compute node
 The compute node remains in the standby state when connected to a power source, while Lenovo XClarity Controller is allowed to respond to remote power-on requests. To completely power off the compute node (power status LED off), you must disconnect all power cables.