Install the front operator panel
Use this information to install the front operator panel.
Before you install a fan, complete the following steps:
Read Safety and Installation Guidelines to ensure that you work safely.
To install the front operator panel, complete the following steps:
After you install the front operator panel, complete the following steps:
Install the top cover onto the server (see Install the top cover).
Install the server into the rack if necessary.
Reconnect power cords and all external cables.
Give documentation feedback