Processor and heat sink replacement
Use this information to remove and install a processor and heat sink assembly.
Make sure that all server power cords are disconnected from their power sources before performing this procedure.
Before replacing a processor, check the current PSB fuse policy. See Service process before replacement at Service process for updating PSB fuse state (Lenovo service technicians only).
After replacing a processor, ensure that the processor fuse status is expected without unexpected XCC event logs. See Service process after replacing a processor at Service process for updating PSB fuse state (Lenovo service technicians only). The fuse status must be the same as the original fuse status of the server.
Check if the firmware version of the system meets the requirement stated in Tip on firmware update for new processors before installing the following processors: 7203, 7203P, 7303, 7303P, 7643P, and 7663P. If no, update the firmware to the required version by following the instructions provided.