Skip to main content

Documents download

This section provides introduction and download link for handy documents.

  • Rail Installation Guide

    • Rail Installation Guide

      Note
      • Two people and one lifting device on site that can support up to 400 lb (181 kg) are required to perform this procedure. If you do not already have a lifting device available, Lenovo offers the Genie Lift GL-8 material lift that can be purchased at Data Center Solution Configurator. Make sure to include the Foot-release brake and the Load Platform when ordering the Genie Lift GL-8 material lift.
      • The maximum lift height for installation is 156 cm (61.5 inches). The maximum units to be installed on the rack is up to 4 units from the bottom to the top of the rack. For more information, see Install the chassis to rack.
  • User Guide

    • Complete overview, system configuration, hardware components replacing, and troubleshooting.

      Selected chapters from User Guide:

      • System Configuration Guide : Server overview, components identification, system LEDs and diagnostics display, product unboxing, setting up and configuring the server.

      • Hardware Maintenance Guide : Installing hardware components, cable routing, and troubleshooting.