Install the top cover
Use this procedure to install the server top cover.
S014
CAUTION
Hazardous voltage, current, and energy levels might be present. Only a qualified service technician is authorized to remove the covers where the label is attached.
S033
CAUTION
Hazardous energy present. Voltages with hazardous energy might cause heating when shorted with metal, which might result in spattered metal, burns, or both.
Before installing the top cover:
Read the safety information and installation guidelines (see Safety and Installation Guidelines).
Make sure all the removed components are installed, and all the disconnected cables are reconnected.
To install the top cover, complete the following steps:
After installing the top cover, complete the following steps:
Reconnect the power cords and any cables that you removed.
Install the server in the rack.
Power on the server and any peripheral devices.
Demo video
Give documentation feedback