Manually triggering the cutover for volume move
For a volume move operation, you can use Storage Manager to manually trigger the cutover when the volume enters the cutover deferred phase. You can set the duration of the cutover and the cutover action to be performed by the system if the operation fails within that duration.
- Click .
- Select the SVM , and then click SVM Settings.
- Click the Volumes tab.
- Expand the volume for which the volume move operation has been initiated.
- Click the Show More Details link to view more information about the volume.
- In the Overview tab, click Cutover .
- In the Cutover dialog box , click Advanced Options .
- Optional: Specify the cutover action and the cutover window period.
- Click OK .
Give documentation feedback