Cabling to a 25GbE data or host network
25GbE ports on the controllers are connected to 25GbE data or host network switches.
You must have contacted your network administrator for information about connecting the system to the switches.
Be sure to check the illustration arrow for the proper cable connector pull-tab orientation.
Note
As you insert the connector, you should feel it click into place; if you do not feel it click, remove it, turn it around and try again.
Step | Perform on each controller module |
---|---|
1 | Cable ports e1a through e1d to the 10GbE host network switches. |
2 | To perform other optional cabling, choose from: |
3 | To complete setting up your system, see Completing system setup and configuration. |