Complete the parts replacement
Use this information to complete the parts replacement.
Ensure that all components have been reassembled correctly and that no tools or loose screws are left inside your server.
Properly route and secure the cables in the server. Refer to the cable connecting and routing information for each component.
If you have removed the server cover, reinstall it. See Install the compute node cover.
- Reconnect external cables and power cords to the server.AttentionTo avoid component damage, connect the power cords last.
Update the server configuration.
Download and install the latest device drivers: Lenovo Data Center Support
Update the system firmware. See Firmware updates.
Update the UEFI configuration.
Reconfigure the disk arrays if you have installed or removed a hot-swap drive or a RAID adapter. See the Lenovo XClarity Provisioning Manager User Guide, which is available for download at: Lenovo Data Center Support