Chassis front view
This section contains information on the front of the chassis installed with nodes.
The chassis can contain up to four 1U nodes or up to two 2U nodes.
Important
- For proper cooling, each node tray must be installed with either a node or node tray fillers before the nodes in the chassis are powered on.
- The installation of nodes must follow the sequence of the tray numbering.
Two 2U nodes
For two 2U nodes: the node in tray 2 ( 2 ) must be installed upside down.
The following illustration shows the front view of the chassis and respective node trays in the chassis.
Figure 1. Chassis front view with two 2U nodes
1 Node tray 1 | 2 Node tray 2 |