Upgrading a chassis with two CMMs
Use these instructions to upgrade a Flex System chassis that has two Flex System CMMs. You can upgrade the CMMs while the chassis is powered on.
Use one of the following procedures to upgrade a Flex System Chassis Management Module to a Lenovo Flex SystemChassis Management Module 2.
Note
- Throughout the following procedure, the
Flex System Chassis Management Module
is referred to as thelegacy CMM
and theLenovo Flex SystemChassis Management Module 2
is referred to as theLenovo CMM 2.
- These instructions assume that the chassis is connected to power.
Before you upgrade the CMMs, complete the following steps:
- Unmanage the chassis in Lenovo XClarity Administrator. For detailed instruction, see Unmanaging a chassis.
- Save the legacy CMM configuration file to a remote system (see Saving a CMM configuration for information).
- Stop all CMM local and remote sessions before you proceed, to avoid an unexpected termination of sessions.
- Remove any external devices that block access to the rear of the chassis.
- Mark and disconnect all cables from the CMMs.
To upgrade a chassis with two legacy CMMs to a chassis with two Lenovo CMM 2s, using manual configuration transfer, complete the following steps:
After the CMMs have been upgraded and verified as functioning, complete the following steps:
- Reconnect any cables to the CMMs that were removed (see Cabling the CMM for instructions).
- Installed any external devices that were removed from the rear of the chassis to access the CMMs.
- Manage the chassis in Lenovo XClarity Administrator. For detailed instruction, see Managing a chassis.
Give documentation feedback