Powering on the equipment at the disaster site
You must power on the MetroCluster components at the disaster site when you are ready to prepare for switchback. In addition, you must also recable the SAS storage connections in direct-attached MetroCluster configurations and enable non-Inter-Switch Link ports in fabric-attached MetroCluster configurations.
Before you begin
You must have already replaced and cabled the MetroCluster components exactly as the old ones.
About this task
The examples in this procedure assume the following:
Site A is the disaster site.
FC_switch_A_1 has been replaced.
FC_switch_A_2 has been replaced.
Site B is the surviving site.
FC_switch_B_1 is healthy.
FC_switch_B_2 is healthy.
The FC switches are present only in fabric-attached MetroCluster configurations.