Racking the hardware components
If you have not received the equipment already installed in cabinets, you must rack the components. Refer to Lenovo ThinkSystem DM/DE Series 2U24, 3U, 4U rail kit installation instructions.
This task must be performed on both MetroCluster sites.
Give documentation feedback