Cabling the cluster interconnect in eight- or four-node configurations
In eight- or four-node MetroCluster configurations, you must cable the cluster interconnect between the local controller modules at each site.
This task must be performed at both MetroCluster sites.
Cable the cluster interconnect from one controller module to the other, or if cluster interconnect switches are used, from each controller module to the switches.
Give documentation feedback