Cable wall replacement
Follow the instructions in this section to remove and install the cable walls.
Note
The server comes with 1U cable walls at both side of the processor board. It is recommended to replace the 1U cable walls with 2U cable walls when there are more than five cables routed at one side.
The 2U cable walls are mandatory in the following configurations:
Front riser assemblies (Riser assembly 6 and Riser assembly 7) x8/x8/x8/x8 configuration
Front riser assemblies (Riser assembly 6 and Riser assembly 7) x16/x16 with E3.S drive configuration
Give documentation feedback