Remove the rail kit from the rack
Follow the instructions in this section to remove the rail kit from the rack.
About this task
Attention
- Read Installation Guidelines and Safety inspection checklist to ensure that you work safely.
- Power off the server and peripheral devices and disconnect the power cords and all external cables. See Power off the server.
- Prevent exposure to static electricity, which might lead to system halt and loss of data, by keeping static-sensitive components in their static-protective packages until installation, and handling these devices with an electrostatic-discharge wrist strap or other grounding system.
After you finish
Install a replacement unit. See the instructions in Rail Installation Guide that comes with the rail kit.
Give documentation feedback