Install a management switch to the rack
Follow instructions in this section to install a management switch to the rack. The procedure must be executed by a trained technician.
S036
![]() | ![]() |
| 18 - 32 kg (39 - 70 lb) | 32 - 55 kg (70 - 121 lb) |
CAUTION
Use safe practices when lifting.

Attention
Do not leave multiple management switches open at the same time, as it may increase the risk of over-tilting or instability.


Attention
- Read Installation Guidelines and Safety inspection checklist to ensure that you work safely.
- Touch the static-protective package that contains the component to any unpainted metal surface on the server; then, remove it from the package and place it on a static-protective surface.
Note
Ensure a lift tool is available to perform the replacement.
Procedure
After you finish
- Reconnect any previously removed cables.
- Complete the parts replacement. See Complete the parts replacement.
Give documentation feedback


Slide the inner rail out until it stops.
Press the white latch.
Remove the inner rail completely from the rack.


