Install the system shuttle
Follow instructions in this section to install the system shuttle. The procedure must be executed by a trained technician.
About this task
S037


CAUTION
The weight of this part or unit is more than 55 kg (121.2 lb). It takes specially trained persons, a lifting device, or both to safely lift this part or unit.
Attention
- Read Installation Guidelines and Safety inspection checklist to ensure that you work safely.
- Make sure that all cables, adapters, and other components are installed and seated correctly and that you have not left loose tools or parts inside the server.
- Make sure that all internal cables are correctly routed. See Internal cable routing.
- Two people and one lifting device on site that can support up to 400 lb (181 kg) are required to perform this procedure. If you do not already have a lifting device available, Lenovo offers the Genie Lift GL-8 material lift that can be purchased at Data Center Solution Configurator. Make sure to include the Foot-release brake and the Load Platform when ordering the Genie Lift GL-8 material lift.
Procedure
Attention
- Make sure two people lift the shuttle by holding the four handles on both sides of the system shuttle. Then, slide the shuttle on a lifting device to move the shuttle.

- Avoid damaging the release levers when the system shuttle is completely removed from the chassis.
After you finish
Complete the parts replacement. See Complete the parts replacement.
Give documentation feedback

Push the shuttle into the chassis slightly, then, lift the two lock latches on both sides of the shuttle.
Slide the shuttle into the chassis.
Push the shuttle fully into the chassis.
Rotate the two release levers until they lock into place.