Skip to main content

Remove the carrier base board (CBB)

Use this information to remove the carrier base board (CBB). This procedure is trained technician only.

About this task

Required tools

Make sure you have the required tools listed below in hand to properly replace the component.

  • Water loop kits

    • SD650-I V3 Water loop service kit (03KH870)

    • SD650-I V3 Water loop putty pad kit (03LD670)

  • Screws and screwdrivers

    Prepare the following screwdrivers to ensure you can install and remove corresponding screws properly.
    Screwdriver TypeScrew Type
    Torx T10 head screwdriverTorx T10 screw
    Phillips #1 head screwdriverPhillips #1 screw
    Phillips #2 head screwdriverPhillips #2 screw
Attention
  • Read Installation Guidelines and Safety inspection checklist to ensure that you work safely.

  • Turn off the corresponding DWC tray that you are going to perform the task on.

  • Disconnect all external cables from the enclosure.

  • Use extra force to disconnect QSFP cables if they are connected to the solution.

  • To avoid damaging the water loop, always use the water loop carrier when removing, installing or folding the water loop.

Procedure

  1. Make preparations for this task.
    1. Remove the tray from the enclosure. See Remove a DWC tray from the enclosure.
    2. Remove the tray cover. See Remove the tray cover.
    3. Remove the cross braces. See Remove the cross braces.
    4. Disconnect the cables from the tray. For power cables, press the latch on the cable connectors. See GPU node cable routing.
  2. Remove all GPU OAMs from the carrier base board. See Remove a GPU OAM.
  3. Remove the ten Phillips #1 screws and remove the carrier base board out of the node with a torque screwdriver set to the proper torque.
    Note
    For reference, the torque required for the screws to be fully tightened/removed is 5.0+/- 0.5 lbf-in, 0.55+/- 0.05 N-M.
    Figure 1. Screws removal
    Screws removal
After you finish

If you are instructed to return the component or optional device, follow all packaging instructions, and use any packaging materials for shipping that are supplied to you.