Skip to main content

Parts list

Use the parts list to identify each of the components that are available for your server.

For more information about ordering the parts shown in Figure 1:

Parts list

Note
Depending on the model, your server might look slightly different from the illustration.
Figure 1. Server components
Graphic showing all parts associated with the server

The parts listed in the following table are identified as one of the following:
  • Tier 1 customer replaceable unit (CRU): Replacement of Tier 1 CRUs is your responsibility. If Lenovo installs a Tier 1 CRU at your request with no service agreement, you will be charged for the installation.

  • Tier 2 customer replaceable unit (CRU): You may install a Tier 2 CRU yourself or request Lenovo to install it, at no additional charge, under the type of warranty service that is designated for your server.

  • Field replaceable unit (FRU): FRUs must be installed only by trained service technicians.

  • Consumable and Structural parts: Purchase and replacement of consumable and structural parts is your responsibility. If Lenovo acquires or installs a structural component at your request, you will be charged for the service.

Table 1. Parts list
IndexDescriptionTier 1 CRUTier 2 CRUFRUConsumable and Structural parts

For more information about ordering the parts shown in Figure 1:

Parts list

1Top cover   
2Power supply (up to two power supplies)   
32.5-inch hard drive (up to eight hard drives)   
4Drive cage   
5Hard drive backplane   
6Cable routing trough (there are two of them)   
7Rear cable guide   
8Server chassis   
9M.2 backplane   
10M.2 retainer clip   
11M.2 guideposts   
12System fan (up to six fans)   
13System fan cage   
14, 20PCIe expansion cage (there are two of them).   
15, 26Expansion cage card (the same card can be installed in the PCIe expansion cages and the I/O expansion cage   
16PCIe expansion cage cover   
17, 19PCIe expansion cage cable tray (a video port and USB port assembly can be installed in PCIe expansion cage 1)   
18Graphics Processing Unit (GPU adapter)   
21Shipping bracket   
22Rack latches (left and right)   
23Operator panel   
24Management port   
25I/O expansion cage   
27PCIe adapter   
28TPM card (for Chinese Mainland only)   
29DIMM (up to 24 can be installed)   
30Processor / Heat sink   
31System board   
32Air baffle   
33Air baffle posts   
34CMOS battery