Install the manifold
Use this information to install the manifold.
About this task
The water might cause irritation to the skin and eyes. Avoid direct contact with the lubricant.
Read Installation Guidelines and Safety inspection checklist to ensure that you work safely.
Ensure proper handling procedures are followed when working with any chemically treated water used in the compute rack cooling system. Ensure that material safety data sheets (MSDS) and safety information are provided by the water chemical treatment supplier and that proper personal protective equipment (PPE) is available as recommended by the water chemical treatment supplier. Protective gloves and eyewear may be recommended as a precaution.
The task in this section requires two or more people.
Procedure
Install the DWC PSU manifold. See Install the DWC PSU manifold.
Install all power supplies. See Install a hot-swap power supply or Install a DWC PSU.
Install the SMM2 and SMM2 support bracket. See Install the SMM2.
Install the drip sensor assembly. See Install the drip sensor assembly.
Install the EMC shields. See Install an EMC shield.
Install all trays into the front of the enclosure. See Install a DWC tray in the enclosure.
Demo video