Install the manifold

Use this information to install the manifold.

CAUTION

The water might cause irritation to the skin and eyes. Avoid direct contact with the lubricant.

S002
disconnect all power
CAUTION
The power-control button on the device and the power switch on the power supply do not turn off the electrical current supplied to the device. The device also might have more than one power cord. To remove all electrical current from the device, ensure that all power cords are disconnected from the power source.
S038
Use eye protection
CAUTION
Eye protection should be worn for this procedure.














Attention
Ensure proper handling procedures are followed when working with any chemically treated water used in the compute rack cooling system. Ensure that material safety data sheets (MSDS) and safety information are provided by the water chemical treatment supplier and that proper personal protective equipment (PPE) is available as recommended by the water chemical treatment supplier. Protective gloves and eyewear may be recommended as a precaution.

Before you install the manifold:

  1. Read the Installation Guidelines to ensure that you work safely.

  2. Make sure the DWC tray(s) are removed from the enclosure (see Remove a DWC tray from the enclosure).

Complete the following steps to install the manifold.

  1. Install new manifold section into the manifold and connect couplings.
    Figure 1. Manifold disassemble
    Manifold disassemble
    Table 1. Manifold disassemble
    1 41mm wrench
  2. Tighten four screws (using the screwdriver contained in the manifold repair kit) between manifold bracket and enclosure.
    Figure 2. Manifold screw locations
    Manifold screw locations
    Table 2. Manifold screw locations
    1 Screws2 Manifold
  3. Starting from the top, connect the manifold bracket for the top manifold section into the top enclosure.
  4. Continue to connect the other manifold sections working from the top down to the bottom.
  5. Reinstall all drip sensor assemblies into enclosure.
    Figure 3. Drip sensor assembly installation
    Drip sensor assembly installation
    Figure 4. Drip sensor assembly
    Drip sensor assembly
    Table 3. Drip sensor assembly
    1 Connector2 Latch
  6. For the manifold water fill/refill process, at the rear of the rack, connect the blue hose assembly (supplied to customer installation site) to the top quick connect at the top of the rack (location A). Make sure the hose still remains in the bucket with the valve closed (valve handle perpendicular to the hose).
    Note
    The red plug cover will need to be removed at all positions first in order to plug to the quick connects.
    Figure 5. Blue hose assembly to top quick connect connection
    Blue hose assembly to top quick connect connection
  7. At the front of the rack, connect the facility supply hose to the rack return hose. Partially open the supply hose, about 1/4 of the way.
    Note
    Do not fully open the facility ball valve or you will reduce your ability to control the flow as you fill the rack.
    Figure 6. Facility supply hose to rack return hose connection
    Facility supply hose to rack return hose connection
  8. At the back of the rack, slowly open the valve on the blue hose part of the way allowing air to flow out of the hose. Allow this to take place until a steady stream of water flows into the bucket or there are minimal bubbles in the sight-glass. It may take approximately one to two minutes for air bubbles to clear the hose.
    Figure 7. Blue hose valve opening
    Blue hose valve opening
  9. Close the valve on the blue hose. Then disconnect the blue hose assembly from Location A and move to Location B. Slowly open the valve and allow this to stay in place until a steady stream of water flows into the bucket or there are minimal bubbles in the sight-glass. Close the valve on the blue hose again.
    Figure 8. Hose assembly movement
    Hose assembly movement
  10. Go back to the front of the rack, disconnect the facility supply hose from the rack return hose and connect the facility supply hose to the rack supply hose.
    Figure 9. Facility supply hose to the rack supply hose connection
    Facility supply hose to the rack supply hose connection
  11. Again, at the back of the rack, ensure the blue hose still remains connected to Location B. Open the valve on the blue hose and leave in place until a steady stream of water flows into the bucket or there are minimal bubbles in the sight-glass.
    Figure 10. Hose assembly movement
    Hose assembly movement
  12. Close the valve on the blue hose. Then remove blue hose assembly from Location B and move to Location A. Open the valve on the blue hose and allow this to stay in place until a steady stream of water flows into the bucket or there are minimal bubbles in the sight-glass.
    Figure 11. Blue hose valve opening
    Blue hose valve opening
  13. Close the valve on the blue hose. Disconnect and move to Location C and open the valve slowly. Leave in place until a steady stream of water flows or minimal bubbles are in the sight-glass. Approximate time 10-15 seconds.
    Note
    • Top position EMC shields on all enclosure positions will need to be removed in order to access the quick connects.
    • The red plug covers will need to be removed first in order to access the quick connects.
    Figure 12. Hose assembly movement
    Hose assembly movement
  14. Close the valve on the blue hose. Disconnect and move the blue hose to Location D and repeat the process down the full rack ensuring each enclosure has minimal air bubbles in the sight glass.
    Figure 13. Hose assembly movement
    Hose assembly movement
  15. Continue to each enclosure from the top enclosure to the bottom enclosure by reaching into each enclosure Location C and Location D quick connects and allow for a steady stream of water to flow. There should be minimal air present in the sight glass.
    Note
    Be sure to always close the valve on the blue hose before disconnecting it from one of the enclosure locations as you work your way down the rack.
  16. Once complete, go back to the front and connect the facility return hose to the rack return hose. Fully open all connections on both the supply and return side. The manifold should be completely filled.
    Figure 14. Facility return hose to the rack return hose connection
    Facility return hose to the rack return hose connection
  17. Check for leaks at the rear or the rack.
  18. Install the FPC support bracket.
  19. Reinstall all FPC card modules and fillers.
    Figure 15. FPC card module installation
    FPC card module installation
  20. Reinstall all EMC shields.
    Figure 16. EMC shields installation
    EMC shields installation
    Figure 17. EMC shields installation
    EMC shields installation
    Figure 18. Retention bracket installation
    Retention bracket installation