Install the front operator panel
Use this information to install the front operator panel.
Before you install the front operator panel, complete the following steps:
- Read the following sections to ensure that you work safely.
Turn off the server. Disconnect the power cords and all external cables (see Power off the server).
Procedure
After you install the front operator panel, complete the following steps:
Install the M.2 WLAN/LTE wireless adapter if removed (see Install the M.2 WLAN/LTE wireless adapter).
Install the lock position switch if removed (see Install the lock position switch).
Install the node if needed (see Install a node).
Reconnect power cords and all external cables.
Demo video
Give documentation feedback