Remove the rails from the rack
Follow the instructions in this section to remove the rails from the rack.
About this task
Read Installation Guidelines and Safety inspection checklist to ensure that you work safely.
Power off the server and peripheral devices and disconnect the power cords and all external cables. See Power off the server.
Prevent exposure to static electricity, which might lead to system halt and loss of data, by keeping static-sensitive components in their static-protective packages until installation, and handling these devices with an electrostatic-discharge wrist strap or other grounding system.
Procedure
After you finish
Install a replacement unit. See the instructions in Rail Installation Guide that comes with the rail kit. For more information, see Rail Installation Guides or ThinkSystem rack server rail options.