Skip to main content

Install the HMC card

Follow instructions in this section to install the HMC card. The procedure must be executed by a trained technician.

About this task

Attention
  • Read Installation Guidelines and Safety inspection checklist to ensure that you work safely.
  • Touch the static-protective package that contains the component to any unpainted metal surface on the server; then, remove it from the package and place it on a static-protective surface.
  • Two people and one lifting device on site that can support up to 400 lb (181 kg) are required to perform this procedure. If you do not already have a lifting device available, Lenovo offers the Genie Lift GL-8 material lift that can be purchased at Data Center Solution Configurator. Make sure to include the Foot-release brake and the Load Platform when ordering the Genie Lift GL-8 material lift.
Note
Make sure you have the required tools listed below available to properly replace the component:
  • One torque screwdriver
  • One Torx T15 bit
Firmware and driver download: You might need to update the firmware or driver after replacing a component.

Procedure

  1. Install the HMC card.
    1. Align the card with its connector on the GPU baseboard; then, press the card into the connector until it is fully seated.
    2. Fasten the screw to secure the card.
      Note
      Loosen or tighten the screws with a torque screwdriver set to the proper torque. For reference, the torque required for the screws to be fully loosen or tighten is 0.59 ± 0.059 newton-meters, 5.22 ± 0.522 inch-pounds.
      Figure 1. HMC card installation
      HMC card installation
  2. Install the NVSwitch heat sink cover.
    1. Place the cover onto the heat sink.
    2. Fasten the four screws to secure the cover.
    Figure 2. NVSwitch heat sink cover installation
    NVSwitch heat sink cover installation

After you finish

  1. Reinstall the GPU shuttle. See Install the GPU shuttle.
  2. Reinstall the rear fan bulkhead. See Install the rear fan bulkhead.
  3. Reinstall the system shuttle. See Install the system shuttle.
  4. Complete the parts replacement. See Complete the parts replacement.