Use the following procedures to remove and install the compute node from the ThinkSystem D2 Enclosure.
Remove a compute node This procedure describes how to remove a compute node from your ThinkAgile CP configuration.
Install a compute node This procedure describes how to add a compute node to your ThinkAgile CP configuration.
Power off the compute node The compute node remains in the standby state when connected to a power source, while Cloud Controller is allowed to respond to remote power-on requests. To completely power off the compute node (power status LED off), you must disconnect all power cables.
Power on the compute node After the compute node performs a short self-test (power status LED flashes rapidly) when connected to input power, it enters the standby state (power status LED flashes once per second).