Roles and responsibilities
This section covers information about the roles and responsibilities involved in the replacement of different ThinkAgile CP hardware components.
Each maintenance and replacement procedure in this guide is performed by one or a combination of the following actors:
Solution administrator: May be customer, third party, or whoever has access to the solution for performing administrative procedures (Cloud Controller, infrastructure)
Customer or field service: For physical replacement of CRUs/FRUs based on part type and entitlement level
Lenovo Support: Works with solution administrator to perform remote support procedures
The following table illustrates which roles are responsible for each of the tasks in this guide. Some tasks can be completed by the customer alone, while other tasks require the participation of Lenovo Support.
Task | Actor | ||
---|---|---|---|
Solution administrator | Customer or field service | Lenovo Support | |
Shuts down compute node on Cloud Controller web portal | |||
OR
| Optional. If customer wants assistance:
| ||
OR
| Optional. If customer wants assistance:
| ||
Physically replaces compute enclosure-to-interconnect cable | |||
|
| ||
Physically installs compute node in enclosure and powers on | |||
| Contacts Lenovosupport to request hardware removal | ||
Performs all steps in task | |||
Performs all steps in task | |||
Performs all steps in task | |||
Performs all steps in task | |||
Performs all steps in task | |||
Performs all steps in task | |||
OR
| Optional. If customer wants assistance:
| ||
OR
| Optional. If customer wants assistance:
| ||
Powers off the storage block (all storage controllers) in the Cloud Controller | |||
Physically replaces storage controller-to-interconnect cable or transceiver | |||
|
| ||
|
| ||
Performs all steps in task | |||
Performs all steps in task | |||
Performs all steps in task | |||
Performs all steps in task | (Optional) Performs all steps in task at customer request. Charges may apply depending on the customer’s warranty terms. | ||
|
|
| |
Performs all steps in task | |||
Performs all steps in task | |||
Make the secondary interconnect switch the primary interconnect | Performs all steps in task | ||
|
| ||
Physically replaces cables connecting the hardware management network to other components | |||
Physically replaces management switch in the rack | |||
Performs all steps in task |