Replacing the lower bezel
This procedure applies only to the 5U server model with hot-swap power supplies.
To install the lower bezel on the 5U server model with hot-swap power supplies, complete the following steps.
- Read the safety information in Safety and Installation guidelines.
- Insert the two bottom tabs on the lower bezel into the corresponding holes in the front of the chassis.Figure 1. Lower bezel installation for 5U server model with hot-swap power supplies
- Rotate the top of the lower bezel up to the chassis; then, press the blue-colored release tab on the right side of the lower bezel and completely close the lower bezel until it locks securely into place.
- Reconnect the external cables and power cords; then, turn on the attached devices and turn on the server.
Give documentation feedback