Skip to main content

Replacing the lower bezel

This procedure applies only to the 5U server model with hot-swap power supplies.

To install the lower bezel on the 5U server model with hot-swap power supplies, complete the following steps.

  1. Read the safety information in Safety and Installation guidelines.
  2. Insert the two bottom tabs on the lower bezel into the corresponding holes in the front of the chassis.
    Figure 1. Lower bezel installation for 5U server model with hot-swap power supplies
    Lower bezel installation for 5U server model with hot-swap power supplies
  3. Rotate the top of the lower bezel up to the chassis; then, press the blue-colored release tab on the right side of the lower bezel and completely close the lower bezel until it locks securely into place.
  4. Reconnect the external cables and power cords; then, turn on the attached devices and turn on the server.