Install a manifold to the rack
Follow instructions in this section to install a manifold to the rack. The procedure must be executed by a trained technician.
About this task
S011


CAUTION
Sharp edges, corners, or joints nearby.
S036
![]() | ![]() |
| 18 - 32 kg (39 - 70 lb) | 32 - 55 kg (70 - 121 lb) |
CAUTION
Use safe practices when lifting.
S038


CAUTION
Eye protection should be worn for this procedure.
S040


CAUTION
Protective gloves should be worn for this procedure.
S042


DANGER
danger
Risk of electric shock due to water or a water solution which is present in this product. Avoid working on or near energized equipment with wet hands or when spilled water is present.

CAUTION
The power-control button on the device and the power switch on the power supply do not turn off the electrical current supplied to the device. The device also might have more than one power cord. To remove all electrical current from the device, ensure that all power cords are disconnected from the power source.
S036
![]() | ![]() |
| 18 - 32 kg (39 - 70 lb) | 32 - 55 kg (70 - 121 lb) |
CAUTION
Use safe practices when lifting.
CAUTION
Electrical current from power, telephone, and communication cables is hazardous. To avoid a shock hazard:
- Connect all power cords to a properly wired and grounded electrical outlet/source.
- Connect any equipment that will be attached to this product to properly wired outlets/sources.
- When possible, use one hand only to connect or disconnect signal cables.
- Never turn on any equipment when there is evidence of fire, water, or structural damage.
- The device might have more than one power cord, to remove all electrical current from the device, ensure that all power cords are disconnected from the power source.
Attention
- Read Installation Guidelines and Safety inspection checklist to ensure that you work safely.
- Touch the static-protective package that contains the component to any unpainted metal surface on the server; then, remove it from the package and place it on a static-protective surface.
Note
Ensure the following tools are available to perform the replacement:
- Two 30L containers (one labeled with “Fresh” and one labeled with Waste") with integrated hose mounts
- Air compressor
- Approved coolant: PG25, NALCO® TCS101, or HPCCL2000 (Deionized water premixed with a compatible antimicrobial agent)
- Cordless transfer pump
- Lift tool
- Liquid cooling service kit includes below:
- Air input kit: Connects the air compressor to the manifold
- Filler kit: Connects the pump to the manifold
- Coolant source kit: Connects the coolant container to the pump
- Manifold accessory kit
- Phillips #1 bit
- Phillips #2 bit
- Spill kit
- Torque screwdriver
- Torx T25 bit
- Torx T40 bit
Procedure
After you finish
- Install the cable cartridges. See Install a cable cartridge to the rack.
- Reinstall the compute trays, management switches, NVLink switch trays and power shelves. See Install a compute tray to the rack, Install a management switch to the rack, Install an NVLink switch tray to the rack, and Install a power shelf to the rack.
- Complete the parts replacement. See Complete the parts replacement.
Give documentation feedback



Loosen the four screws securing the block.
Remove the block out of the bracket.






Tighten the two bottom screws.








Attach the coolant source kit to the pump, then place the opposite end into the coolant container labeled with “Fresh”.