Install a GPU power distribution board (trained technician only)

Use this information to install a GPU power distribution board.

About this task

Required tools

Make sure you have the required tools listed below in hand to properly replace the component.

  • Water loop kits

    • SD650-N V3 Water Loop Gap Pad Kit (The water loop carrier in the Service Kit is reusable, it is recommended to keep it at the facility where the server operates for future replacement needs.)

    • SD650-N V3 Water Loop Putty Pad Kit

    • SD650-N V3 SXM5 PCM Fixture

    • SXM5 PCM Kit

  • Screws and screwdrivers

    Prepare the following screwdrivers to ensure you can install and remove corresponding screws properly.
    Screw TypeScrewdriver Type
    Torx T10 screwTorx T10 head screwdriver
    Torx T15 screwTorx T15 head screwdriver
    Phillips #1 screwPhillips #1 head screwdriver
    Phillips #2 screwPhillips #2 head screwdriver
CAUTION

SD650-N V3 GPU power distribution board handling guidelines

When handling the GPU power distribution board, MAKE SURE to follow the following guidelines:
  • Gently handle the power distribution board with care; do not apply extra force to the board.

  • Place the GPU power distribution board upside down on a flat surface when you are not holding it.

  • Discard any GPU power distribution board that has been dropped.

  • MAKE SURE to hold the power connectors and the power cable connectors when handling the GPU power distribution board, as shown below. DO NOT touch anywhere else of the power distribution board.
    Figure 1. SD650-N V3 GPU power distribution board touch points
    SD650-N V3 GPU power distribution board touch points
Important
Gap pad/putty pad replacement guidelines
  • To identify the gap pad/putty pad location and orientation, see Gap pad/Putty pad identification and location.

  • Before replacing the gap pad/putty pad, gently clean the interface plate or the hardware surface with an alcohol cleaning pad.

  • Hold the gap pad/putty pad carefully to avoid deformation. Make sure no screw hole or opening is blocked by the gap pad/putty pad material.

  • Do not use expired putty pad. Check the expiry date on putty pad package. If the putty pads are expired, acquire new ones to properly replace them.

Attention
  • Read Installation Guidelines and Safety inspection checklist to ensure that you work safely.

  • Turn off the corresponding DWC tray that you are going to perform the task on.

  • Disconnect all external cables from the enclosure.

  • Use extra force to disconnect QSFP cables if they are connected to the solution.

  • To avoid damaging the water loop, always use the water loop carrier when removing, installing or folding the water loop.

  • A torque screwdriver is available for request if you do not have one at hand.

Firmware and driver download: You might need to update the firmware or driver after replacing a component.
Watch the procedure
  • A video of this procedure is available at YouTube.

Procedure

Note
When handling the GPU power distribution board, make sure to follow GPU power distribution board handling guidelines.

  1. Align the connector with the slot and place the GPU power distribution board into the node.
    Figure 2. GPU power distribution board installation
    Installing the GPU power distribution board
  2. Fasten the two screws to secure the GPU power distribution board with the node.
    Figure 3. GPU power distribution board screw installation
    GPU power distribution board screw installation
  3. Replace the Phase Change Material (PCM) and putty pads on the GPU node water loop with new ones.
    1. Install the PCM jig on the GPU cold plate.
    2. Attach the PCM to the square opening of the jig.
    3. Repeat to replace the PCM of all four GPU cold plates.
      Figure 4. Water loop GPU cold plate PCM replacement (GPU node)
      Water loop GPU cold plate PCM replacement
    4. Replace the putty pads on the GPU node water loop.
      Figure 5. Water loop putty pads replacement (GPU node)
      Putty pads on the GPU node water loop putty pads replacement
    5. Replace the putty pads (x5) on the GPU. Make sure to align the putty pads to the GPU VR (1) and the markings on GPU. Repeat to replace all putty pads on the four GPUs.
      1 GPU VR (Cover the GPU VR with putty pad)
      Figure 6. GPU putty pads replacement
      GPU putty pads replacement

Make sure to follow Gap pad/putty pad replacement guidelines.

  1. Flip the GPU node water loop back to the GPU node.
    Figure 7. Flipping GPU node water loop to the GPU node
    Flipping GPU node water loop to the GPU node
  2. Loosen water loop carrier screws (x20 Phillips #2 screws).
    Figure 8. Water loop screws and quick connect screws installation (GPU node)
    Water loop screws and quick connect screws installation (GPU node)
  3. Remove the water loop carrier from the GPU node.
    Figure 9. Water loop carrier removal (GPU node)
    Water loop carrier removal (GPU node)
  4. Install GPU cold plate screws (x16 PH2 screws). Install the GPU cold plates in diagonal pattern. Complete installing screws of GPU 2, then proceed to GPU 4 > GPU 1 > GPU 3.
    1. Set the torque screwdriver to 3.5 lb-In, 0.39 N-m.
    2. Fasten the screws for 720 degree following the screw installation sequence:
      Note
      Make sure to follow screw installation sequence to prevent GPU cold plate tilting.
    3. Repeat until all screws on the four GPU cold plates are fully tightened
    Note
    For reference, the torque required for the screws to be fully tightened/loosened is 0.4+/-0.05 N-m, 3.5+/-0.5 lb-In.
    Figure 10. GPU cold plate screw installation
    GPU cold plate screw installation
  5. Follow the screw installation sequence specified on the network board label, and install network cold plate screws (x8 Torx T10 screws) with a torque screwdriver set to the proper torque.
    Note
    For reference, the torque required for the screws to be fully tightened/removed is 5.0+/- 0.5 lbf-in, 0.55+/- 0.05 N-M.
    Figure 11. Network card screw installation
    Network card screw installation
  6. Install the quick connect screws (x4 Torx T10) with a torque screwdriver set to the proper torque.
    Note
    For reference, the torque required for the screws to be fully tightened/removed is 5.0+/- 0.5 lbf-in, 0.55+/- 0.05 N-M.
    Figure 12. Quick connect screw installation (GPU node)
    Quick connect screw installation (GPU node)
  7. Install water loop screws and quick connect screws (x11 Torx T10 screws) with a torque screwdriver set to the proper torque.
    Note
    For reference, the torque required for the screws to be fully tightened/removed is 5.0+/- 0.5 lbf-in, 0.55+/- 0.05 N-M.
    Figure 13. Water loop Torx T10 screws installation (GPU node)
    Water loop Torx T10 screws installation (GPU node)
  8. Install the Hex screw (x1) and the PH1 screws (x3).
    Note
    For reference, the torque required for the screws to be fully tightened/removed is 5.0+/- 0.5 lbf-in, 0.55+/- 0.05 N-M.
    Figure 14. Water loop Hex and PH1 screws installation (GPU node)
    Water loop Hex and PH1 screws installation (GPU node)
  9. Install the cable tie to the GPU board.
    Figure 15. Installing the cable tie
    Installing the cable tie
  10. Connect the carrier board power cable.
    Figure 16. Connecting carrier board power cable

    From (carrier board)To (GPU node power distribution board)
    1 Power and side band connector1 Power connector
After you finish
  1. Install the MCIO cables. Follow the guidance and routing information in Internal cable routing.

  2. Install the bus bar. See Install the bus bar.

  3. Install the cross braces. See Install the cross braces.

  4. Install the tray cover. See Install the tray cover.

  5. Install the tray into the enclosure. See Install a DWC tray in the enclosure.

  6. Connect all required external cables to the solution.
    Note
    Use extra force to connect QSFP cables to the solution.
  7. Check the power LED on each node to make sure it changes from fast blink to slow blink to indicate all nodes are ready to be powered on.