Skip to main content

Install the manifold (in-row system)

Use this information to install the manifold in an in-row direct water cooling system.

About this task

Important

This task must be operated by trained technicians that are certified by Lenovo Service. Do not attempt to remove or install the part without proper training and qualification.

CAUTION

The coolant might cause irritation to the skin and eyes. Avoid direct contact with the coolant.

S002
disconnect all power
CAUTION

The power-control button on the device and the power switch on the power supply do not turn off the electrical current supplied to the device. The device also might have more than one power cord. To remove all electrical current from the device, ensure that all power cords are disconnected from the power source.

S011
sharp edge
CAUTION

Sharp edges, corners, or joints nearby.

S038
Use eye protection
CAUTION

Eye protection should be worn for this procedure.

S040
use protective gloves
CAUTION

Protective gloves should be worn for this procedure.

S042
Danger

DANGER

danger

Risk of electric shock due to water or a water solution which is present in this product. Avoid working on or near energized equipment with wet hands or when spilled water is present.

Attention
  • Read Installation Guidelines and Safety inspection checklist to ensure that you work safely.

  • Power off the server and peripheral devices and disconnect the power cords and all external cables. See Power off the server.

  • Prevent exposure to static electricity, which might lead to system halt and loss of data, by keeping static-sensitive components in their static-protective packages until installation, and handling these devices with an electrostatic-discharge wrist strap or other grounding systems.

  • Ensure proper handling procedures are followed when working with any chemically treated coolant used in the rack cooling system. Ensure that material safety data sheets (MSDS) and safety information are provided by the coolant chemical treatment supplier and that proper personal protective equipment (PPE) is available as recommended by the coolant chemical treatment supplier. Protective gloves and eyewear may be recommended as a precaution.

  • This task requires two or more people.

Procedure

  1. To install the Direct Water Cooling Module (DWCM), see Install the Lenovo Neptune(TM) Processor Direct Water Cooling Module.
  2. To install the server into the rack, see Install the server to rack.
  3. Install the manifold.
    Figure 1. Installing the manifold

    1. Hold the manifold with both hands, and mount it onto the rack cabinet.
    2. Align the spools with holes, and clutch the cabinet.
    Note

    For more information about the rack cabinet, see ThinkSystem Heavy Duty Full Depth Rack Cabinets User Guide.

  4. Repeat 3 to the other manifold.
  5. Install the quick connect plug to the manifolds.
    Figure 2. Installing the quick connect plug

    1. Remove the rubber quick connect plug covers from the ports on the manifold.
    2. Connect the plug to the manifold port.
  6. Install the hose kit to the manifold.
    Figure 3. Installing the hose kit
    Hose assembly to top quick connect

    1 17 mm wrench

    1. Connect the hose kits to both manifolds.
    2. Wrap the interface around with the clamp.
    3. Close the clamp.
    4. Lift the screw upright.
    5. Tighten the screw and make sure that it is secured.
  7. Install the bleeder kit to the manifold supply side.
    Figure 4. Installing the bleeder kit to the supply side
    Installing the bleeder kit on the supply/inlet side

    1. Remove the rubber quick connect plug covers from the ports on the manifold.
    2. Plug the bleeder kit to the manifold.
  8. To push the air out of the manifold supply side, connect facility supply to manifold return.
    Figure 5. Facility supply to manifold return

    1. Press the button on the ball valve switch.
    2. Rotate both switches open and stop at around 1/4 of 90 degrees.
      Attention
      • Open the ball valves on 1 manifold return side and 2 facility supply side, while keep manifold supply side closed.

      • Do not fully open the ball valves, or the water flow gets too rapid to contain.

  9. Slowly open the bleeder valve to conduct the air out of the hose. Close the bleeder valve once a steady stream of water flows into the bucket or there are only minimal bubbles in the bleeder hose.
    Figure 6. Opening the bleeder valve on the supply side
    Opening the bleeder kit

  10. Install the bleeder kit to the manifold return side.
    Figure 7. Installing the bleeder kit on the return side
    Installing the bleeder kit to the return side

    1. Remove the rubber quick connect plug covers from the ports on the manifold.
    2. Plug the bleeder kit to the manifold.
  11. To push the air out of the manifold return side, connect facility supply to manifold supply.
    Figure 8. Facility supply to manifold supply

    1. Press the button on the ball valve switch.
    2. Rotate both switches open and stop at around 1/4 of 90 degrees.
      Attention
      • Open the ball valves on 1 manifold supply side and 2 facility supply side, while keep manifold return side closed.

      • Do not fully open the ball valves, or the water flow gets too rapid to contain.

  12. Slowly open the bleeder valve to conduct the air out of the hose. Close the bleeder valve once a steady stream of water flows into the bucket or there are only minimal bubbles in the bleeder hose.
    Figure 9. Opening the bleeder valve on the return side
    Opening the bleeder kit

  13. (For precaution) To make sure that the air inside is as little as possible, re-install the bleeder kit back to manifold supply side and do it one more time. Close the bleeder valve once a steady stream of water flows into the bucket or there are only minimal bubbles in the bleeder hose.
    Figure 10. Opening the bleeder valve on the supply side
    Opening the bleeder kit

  14. Once completed, connect the supply and return of manifold and facility correspondingly. Fully open all connections on both supply and return sides.
    Figure 11. Opening ball valves
    Opening ball valves

    Note

    1 Manifold supply connects to 2 facility supply

    3 Manifold return connects to 4 facility return

    1. Press the button on the ball valve switch.
    2. Rotate the switch to fully open the valves as illustrated above.
After you finish

Complete the parts replacement. See Complete the parts replacement.

Demo video

Watch the procedure on YouTube