Install the PCIe switch board

Follow instructions in this section to install the PCIe switch board. The procedure must be executed by a trained technician.

About this task

Attention
  • Read Installation Guidelines and Safety inspection checklist to ensure that you work safely.
  • Touch the static-protective package that contains the component to any unpainted metal surface on the server; then, remove it from the package and place it on a static-protective surface.
Note
Make sure you have a torque screwdriver available to properly replace the component.

Procedure

  1. Align the PCIe switch board with the standoffs on the NVMe drive and PCIe switch board cage; then, gently place the board onto the cage.
  2. Fasten the eight screws to secure the PCIe switch board.
    Note
    Tighten the screws with a torque screwdriver set to the proper torque. For reference, the torque required for the screws to be fully tighten is 0.9 ± 0.2 newton-meters.
    Figure 1. PCIe switch board installation
    PCIe switch board installation
  3. If necessary, attach the labels to both ends of the cables.
    1. Attach the white space portion of the label to one end of the cable.
    2. Wrap the label around the cable and attach it to the white space portion.
    3. Repeat to attach the other label to the opposite end of the cable.
    Figure 2. Label application
    Label application
    Note
    See the tables below to identify the corresponding labels for the cables.
    FromLabelToLabel
    PCIe switch board: MCIO connector K
    • MCIO K
    System board: MCIO connector 6A
    • P2-6A
    • MCIO K
    System board: MCIO connector 6B
    • P3-6B
    • MCIO K
    PCIe switch board: MCIO connector J
    • MCIO J
    System board: MCIO connector 3A
    • P2-3A
    • MCIO J
    System board: MCIO connector 3B
    • P3-3B
    • MCIO J
    PCIe switch board: Sideband connector
    • SB SWT
    • SB
    System board: PCIe switch board sideband connector
    • SB SWT
    • SB
    PCIe switch board: Power connector
    • SW PWR
    • RISER PWR 2
    Power distribution board: PCIe switch board power connector
    • SW PWR
    • RISER PWR 2

After you finish

  1. Reinstall all the PCIe switch board heat sinks. See Install a PCIe switch board heat sink.
  2. Reinstall all the PCIe adapters. See Install a PCIe adapter.
  3. Reinstall the M.2 drive cage. See Install the M.2 drive cage and backplane
  4. Reinstall all the hot-swap M.2 drive assemblies. See Install a hot-swap M.2 drive assembly
  5. Reinstall the NVMe drive and PCIe switch board cage. See Install the NVMe drive and PCIe switch board cage.
  6. Reinstall the front fan cage. See Install the front fan cage.
  7. Push the system shuttle fully into the chassis.
    1. Lift the two lock latches on both sides of the shuttle.
    2. Slide the shuttle into the chassis.
    3. Push the shuttle fully into the chassis.
    4. Rotate the two release levers until they lock into place.
    Figure 3. System shuttle installation
    System shuttle installation

    System shuttle installation
  8. Complete the parts replacement. See Complete the parts replacement.