Install an MI300X GPU and heat sink module

Follow instructions in this section to install an MI300X GPU and heat sink module. The procedure must be executed by a trained technician.

About this task

Attention
  • Read Installation Guidelines and Safety inspection checklist to ensure that you work safely.
  • Touch the static-protective package that contains the component to any unpainted metal surface on the server; then, remove it from the package and place it on a static-protective surface.
  • Two people and one lifting device on site that can support up to 400 lb (181 kg) are required to perform this procedure. If you do not already have a lifting device available, Lenovo offers the Genie Lift GL-8 material lift that can be purchased at Data Center Solution Configurator. Make sure to include the Foot-release brake and the Load Platform when ordering the Genie Lift GL-8 material lift.
  • Make sure to inspect the connectors and sockets on the GPU and the GPU baseboard. Do not use the GPU or the GPU baseboard if its connectors are damaged or missing, or if there are debris in the sockets. Replace the GPU or the GPU baseboard with a new one before continuing the installation procedure.
  • GPU and heat sink is one part. Do not remove the heat sink from the GPU.
  • The following table shows the mapping information about the physical GPU sockets and corresponding slot numbering in XCC.


    Physical GPU socketsSlot numbering in XCC
    GPU 0Slot 23
    GPU 1Slot 24
    GPU 2Slot 22
    GPU 3Slot 21
    GPU 4Slot 19
    GPU 5Slot 20
    GPU 6Slot 18
    GPU 7Slot 17
Note
Make sure you have the required tools listed below available to properly replace the component:
  • Torque screwdriver which can be set to 1.53 newton-meters, 13.5 inch-pounds
  • Torx T15 extended bit (6-inch long)
Firmware and driver download: You might need to update the firmware or driver after replacing a component.

Procedure

  1. Hold the handle (1) on the GPU and heat sink module; then, align the GPU and heat sink module with the two guide holes on the GPU baseboard, and gently place it onto the GPU baseboard.
  2. Follow the sequence (screw 4 screw 3 screw 2 screw 1) to fasten the four screws to secure the GPU and heat sink module.
    Note
    Loosen or tighten the screws with a torque screwdriver set to the proper torque. For reference, the torque required for the screws to be fully loosen or tighten is 1.53 newton-meters, 13.5 inch-pounds.
    Figure 1. GPU and heat sink module installation
    GPU and heat sink module installation

After you finish

  1. (GPU and heat sink module 0, 1, 6, and 7 only) Reinstall the GPU air duct. See Install an MI300X GPU air duct.
  2. Reinstall the power complex. See Install the power complex.
  3. Reinstall the 8U GPU shuttle. See Install the 8U GPU shuttle.
  4. Reinstall all the 2.5-inch hot-swap drives or drive bay fillers (if any) into the drive bays. See Install a 2.5-inch hot-swap drive
  5. Reinstall all the front fans. See Install a hot-swap fan (front and rear).
  6. Reinstall all the power supply units. See Install a hot-swap power supply unit.
  7. Complete the parts replacement. See Complete the parts replacement.