Preparing server hardware
Use the server setup checklist to ensure that the server hardware is operational prior to cluster deployment.
| Phase | Task |
| 1 | Unpack the server and install any separately shipped components/peripherals to the server. |
| 2 | Connect required internal cables if applicable. |
| 3 | Install the server in the rack. |
| 4 | Connect external cables and power cords. |
| 5 | Verify BMC and UEFI firmware versions and update them to the required levels. For details, see Firmware/drivers/software updates. |
| 6 | Perform the green light check and resolve any installation issues. For details, see Troubleshooting. |
| 7 | (Optional) Image the server with a hypervisor and AOS combination if necessary.
|