Completing the installation
Use this information to complete the installation.
To complete the installation, complete the following steps:
- If you removed the air baffle, reinstall it (see Installing the air baffle).
- If you removed a PCIe riser-card assembly, reinstall it (see Installing a PCI riser-card assembly).
- If you have the optional hot-swap rear hard disk drive cage installed, rotate it down (see Rotating the hot-swap rear hard disk drive cage down.
- If you removed the server top cover, replace it (see Installing the server top cover).
- Install the server in the rack cabinet (see the Rack Installation Instructions that come with the server for instructions).
- To attach peripheral devices and connect the power cords, see Front view).
- Update the server configuration (see Updating the server configuration).
- Slide the server back into the rack, if necessary.
- Start the server. Confirm that is starts correctly and recognizes the newly installed devices, and make sure that no error LEDs are lit.
- (Business Partners only) Complete the additional steps in Instructions for Business Partners.NoteRemember to route the power cord through the cable retainer clip so that it does not accidentally become disconnected.Figure 1. Power cord
- Installing the air baffle
Use this information to install the air baffle. - Installing a PCI riser-card assembly
Use this information to install a PCI riser-card assembly. - Rotating the hot-swap rear hard disk drive cage down
Use this information to rotate the optional hot-swap rear hard disk drive cage down. - Installing the server top cover
Use this information to install the server top cover. - Updating the server configuration
Use this information to update the server configuration.
Give documentation feedback