Skip to main content

Install the top cover

Use this information to install the top cover.

To avoid possible danger, read and follow the following safety information.

S014
shock hazard
CAUTION
Hazardous voltage, current, and energy levels might be present. Only a qualified service technician is authorized to remove the covers where the label is attached.
S033
240VA shock hazard
CAUTION

Hazardous energy present. Voltages with hazardous energy might cause heating when shorted with metal, which might result in spattered metal, burns, or both.

Before you install the top cover, complete the following steps:
  1. Read the following section(s) to ensure that you work safely.
  2. Make sure all the removed components are installed, and all the disconnected cables inside the server are reconnected.

To install the top cover, complete the following steps:

Figure 1. Top cover installation
Top cover installation
  1. Align the posts inside the top cover with the slots on the chassis.
  2. Hold the front of the server and slide the top cover towards the front server until it clicks into place.
After you install the top cover, complete the following steps:
  1. Install the server into rack if necessary.

  2. Reconnect power cords and all external cables.

  3. Turn on the server (see Power on the server).

Demo video

Watch the procedure on YouTube