Install the front top cover
Follow the instructions in this section to install the front top cover.
About this task
Hazardous energy present. Voltages with hazardous energy might cause heating when shorted with metal, which might result in spattered metal, burns, or both.
Read Installation Guidelines and Safety inspection checklist to ensure that you work safely.
Prevent exposure to static electricity, which might lead to system halt and loss of data, by keeping static-sensitive components in their static-protective packages until installation, and handling these devices with an electrostatic-discharge wrist strap or other grounding system.
Make sure that all cables, adapters, and other components are installed and seated correctly and that you have not left loose tools or parts inside the server.
Make sure that all internal cables are correctly routed. See Internal cable routing.
Procedure
- Align the front top cover guide pins with the guide holes on chassis; then place the front top cover on top of the server with both sides aligned.
- Rotate the latch down until it stops.
- Fasten the two M3 screws (PH1, 2 x M3, 0.5 newton-meters, 4.3 inch-pounds).
After you finish
Complete the parts replacement. See Complete the parts replacement.