Skip to main content

Install an EIA flange

Follow the instructions in this section to install an EIA flange.

About this task

Attention
  • Read Installation Guidelines and Safety inspection checklist to ensure that you work safely.

  • Power off the server and peripheral devices, disconnect the power cords from the primary chassis, then disconnect the power cords from the secondary chassis. See Power off the server.

  • Prevent exposure to static electricity, which might lead to system halt and loss of data, by keeping static-sensitive components in their static-protective packages until installation, and handling these devices with an electrostatic-discharge wrist strap or other grounding system.

  • If the server is installed in a rack, remove the server from the rack. See Remove the server from rails.

Procedure

Align and install the EIA flange to the chassis and secure it with install nine screws.
Figure 1. Installing EIA flange
Installing EIA flange

After you finish

  1. Reinstall the front top cover. See Install the front top cover.

  2. Complete the parts replacement. See Complete the parts replacement.

Demo video

Watch the procedure on YouTube