Follow the instructions in this section to remove the server from the rails.
About this task
S036
|
|
18 - 32 kg (39 - 70 lb) | 32 - 55 kg (70 - 121 lb) |
Use safe practices when lifting.
R006Do not place any object on top of a rack-mounted device unless that rack-mounted device is intended for use as a shelf. | S037The weight of this part or unit is more than 55 kg (121.2 lb). It takes specially trained persons, a lifting device, or both to safely lift this part or unit. |
Read Installation Guidelines and Safety inspection checklist to ensure that you work safely.
Power off the server and peripheral devices, disconnect the power cords from the primary chassis, then disconnect the power cords from the secondary chassis. See Power off the server.
Prevent exposure to static electricity, which might lead to system halt and loss of data, by keeping static-sensitive components in their static-protective packages until installation, and handling these devices with an electrostatic-discharge wrist strap or other grounding system.
- Depending on the configuration, your server might be slightly different from the image.
- The primary chassis is shown below as an example, the secondary chassis is similar.
Procedure
- Power off the server and peripheral devices, disconnect the power cords from the primary chassis, then disconnect the power cords from the secondary chassis. See Power off the server.
- If a security bezel is installed, remove it. See Remove the security bezel.
- Disengage the sever if it has been secured to the rack.
- Determine the lifting method. Two lifting options are available:
For two-person lift, remove the following components beforehand: - All the power supply units
- All the storage drives
- Top cover
|
Otherwise, lift the server with three people or a lifting device. |
| Make sure to lift the server by holding the lift points. |
1 Lift point | |
- Disconnect the sideband cables from the primary and secondary chassis.
Figure 1. Disconnecting sideband cables 1 Sideband cable 1 | 1 Sideband cable 2 |
- Open the UPI cover on the primary chassis.
Figure 2. Opening UPI cover - Loosen the thumbscrew on the UPI cover. Use a screwdriver if needed.
- UPI cover will open automatically.
- Disconnect the external UPI cables from the primary chassis.
Figure 3. Disconnecting external UPI cables 1 External UPI cable 1 | 5 External UPI cable 5 |
2 External UPI cable 2 | 6 External UPI cable 6 |
3 External UPI cable 3 | 7 External UPI cable 7 |
4 External UPI cable 4 | 8 External UPI cable 8 |
- Repeat the previous two steps on the secondary chassis to disconnect and remove the external UPI cables.
- Disconnect all external cables from the chassis.
When disconnecting cables, make a list of each cable and record the connectors the cable is connected to, and use the record as a cabling checklist after installing the chassis back into the rack.
- Remove the server along with the inner rails from rack
- Install the front lift handle.
- Lift the first lock latches up to proceed sliding out.
- Attach the rear handles.
- Lift the second lock latches up and remove the server completely from the rack; then place it on a table.
- Remove the lift handles.
- Loosen and remove an M4 screw in the corresponding hole on both inner rails as shown.
- Remove the inner rail from the server.
|
- Press and hold on the release tab; then, simultaneously, slide the inner rail backwards until the T-pins on the server disengaged from the inner rail.
- Remove the inner rail from the server.
|
- Repeat the previous two steps on the other rail.