Skip to main content

Replacing the bezel

This procedure applies only to 4U server models with non-hot-swap power supplies.

To install the bezel on 4U server models with non-hot-swap power supplies, complete the following steps.

  1. Insert the three tabs on the bezel into the corresponding holes in the front of the server.
  2. Rotate the bezel to the server until it locks securely into place.

  3. Reconnect the external cables and power cords; then, turn on the attached devices and turn on the server.