Replacing the bezel
This procedure applies only to 4U server models with non-hot-swap power supplies.
To install the bezel on 4U server models with non-hot-swap power supplies, complete the following steps.
- Insert the three tabs on the bezel into the corresponding holes in the front of the server.
- Rotate the bezel to the server until it locks securely into place.
- Reconnect the external cables and power cords; then, turn on the attached devices and turn on the server.
Give documentation feedback