Skip to main content

Install the processor socket protective film

This task has instructions for installing the processor socket protective film.

About this task

Important
Gap pad/putty pad replacement guidelines
  • To identify the gap pad/putty pad location and orientation, see:

  • Before replacing the gap pad/putty pad, gently clean the interface plate or the hardware surface with an alcohol cleaning pad.

  • Hold the gap pad/putty pad carefully to avoid deformation. Make sure no screw hole or opening is blocked by the gap pad/putty pad material.

  • Do not use expired putty pad. Check the expiry date on putty pad package. If the putty pads are expired, acquire new ones to properly replace them.

Required tools

Make sure you have the required tools listed below in hand to properly replace the component.

  • SD665-N V3 Water Loop Service Kit (The water loop carrier in the Service Kit is reusable, it is recommended to keep it at the facility where the server operates for future replacement needs.)

  • SD665-N V3 Water Loop Putty Pad Kit

  • SD665-N V3 OSFP Putty Pad Kit

    Putty pad cannot be reused. Whenever the water loop is removed, putty pads must be replaced with new ones before reinstalling the water loop.

  • Drive gap pad or putty pad kits according to the drives installed in the tray. See their respective replacement procedures for more information.

  • Screws and screwdrivers

    Prepare the following screwdrivers to ensure you can install and remove corresponding screws properly.
    Screw TypeScrewdriver Type
    Hex screw6 mm hex head screwdriver
    Torx T10 screwTorx T10 head screwdriver
    Phillips #1 screwPhillips #1 head screwdriver
    Phillips #2 screwPhillips #2 head screwdriver
Attention
  • Read Installation Guidelines and Safety inspection checklist to ensure that you work safely.

  • Turn off the corresponding DWC tray that you are going to perform the task on.

  • Disconnect all external cables from the enclosure.

  • Use extra force to disconnect QSFP cables if they are connected to the solution.

  • To avoid damaging the water loop, always use the water loop carrier when removing, installing or folding the water loop.

Firmware and driver download: You might need to update the firmware or driver after replacing a component.

Procedure

  1. Install the processor socket protective film to the processor socket.
    Attention
    Processor socket protective film can only be installed in processor socket 2.
    Figure 1. Processor socket protective film installation
    Processor socket protective film installation
  2. Apply the thermal grease on the top of the processor with syringe by forming four uniformly spaced dots, while each dot consists of about 0.1 ml of thermal grease.
    Note
    Carefully place the processor and retainer on a flat surface with the processor-contact side down.
    Figure 2. Thermal grease application
    Applying thermal grease
  3. If needed, remove plastic grease covers from the underside of processor cold plates.
    Figure 3. Plastic grease covers removal
    Plastic grease covers removal
  4. Check the gap pads on the bottom side and top side of the water loop, if any of them are damaged or missing, replace them with the new ones.
    Figure 4. Water loop gap pads (bottom side)
    Water loop gap pads (bottom side)
    Figure 5. Water loop gap pads (top side)
    Water loop gap pads (top side)

Make sure to follow Gap pad/putty pad replacement guidelines.

  1. Replace the putty pads on the water loop with new ones.
    Attention
    Putty pad cannot be reused. Whenever a component is removed, putty pads must be replaced with new ones before reinstalling the component.
    Figure 6. Water loop putty pads
    Water loop putty pads

Make sure to follow Gap pad/putty pad replacement guidelines.

  1. Carefully rotate the top side of the water loop, position the water loop on the two guide pins near the rear of the node; then, gently put the water loop down and ensure it is firmly seated on the system board.
    Attention
    Make sure to align the water loop with the three guide pins on the right side compute node.
    Figure 7. Guide pins on the compute node
    Guide pins on the compute node
    Figure 8. Water loop installation
    Water loop installation
  2. Install processor cold plate screws (x12 Torx T20 screws for the CPU node). Follow the screw sequence specified below and tighten the screws with a torque screwdriver. Fully tighten each screw; then, proceed to the next screw.
    Note
    For reference, the torque required for the screws to be fully tightened/removed is 1.12-1.46 newton-meters, 10-13 inch-pounds
    Figure 9. Processor cold plate installation
    Fully tighten each screw the order below:
    ProcessorScrew sequence
    A2 > 1 > 4 > 6 > 5 > 3
    B2 > 1 > 5 > 3 > 4 > 6

    Processor cold plate label

    Processor cold plate installation
  3. Loosen water loop carrier screws (12x Phillips #2 screws).
    Note
    Select screw holes marked as R on the rear of the shipping bracket.
    Figure 10. Loosening water loop carrier screws
    Water loop carrier screws removal
  4. Remove the water loop carrier from the compute node.
    Figure 11. Water loop carrier removal (Compute node)
    Water loop carrier removal (Compute node)
  5. Install water loop screws and quick connect screws (14x Torx T10 screws per node) with a torque screwdriver set to the proper torque.
    Note
    • For reference, the torque required for the screws to be fully tightened/removed is 5.0+/- 0.5 lbf-in, 0.55+/- 0.05 N-M.

    • Install the 1 VR cold plate screws (x2) with washers. Use the washers previously removed from the water loop.

    Figure 12. VR cold plate screws with washer
    VR cold plate screws with washer
    Figure 13. Water loop screws and quick connect screws installation


    Water loop screws and quick connect screws installation
  6. Install the five Torx T10 screws to secure the quick connect.
    Note
    For reference, the torque required for the screws to be fully tightened/removed is 5.0+/- 0.5 lbf-in, 0.55+/- 0.05 N-M.
    Figure 14. Quick connect screw installation (Compute node)
    Quick connect screw installation (Compute node)
  7. Replace the putty pads on the top side and the bottom side of the OSFP module conduction plate.
    Attention
    Putty pad cannot be reused. Whenever a component is removed, putty pads must be replaced with new ones before reinstalling the component.
    Figure 15. OSFP module conduction plate putty pads replacement
    OSFP module conduction plate putty pads replacement

    1 Conduction plate top putty pad

    2 Conduction plate bottom putty pad

Make sure to follow Gap pad/putty pad replacement guidelines.

  1. Install the OSFP module conduction plate onto the water loop.
    Screw TypeScrewdriver Type
    1 M3x5 screw (x3)Phillips #1 head screwdriver
    2 M3 screw (x2)T10 screwdriver
    Figure 16. Installing the OSFP module conduction plate
    the OSFP module conduction plate
  2. Install the two Hex screws to the OSFP module with a 4.5 mm hex head screwdriver.
    Figure 17. OSFP module conduction plate Hex screws installation
    OSFP module conduction plate Hex screws installation
After you finish
  1. Install the OSFP module. See Install the OSFP module.

  2. Install the drive cage. See Install a drive cage assembly.

  3. Install the MCIO cables. Follow the guidance and routing information in Internal cable routing.

  4. Install the bus bar. See Install the bus bar.

  5. Install the M.2 backplane assembly. See Install the M.2 backplane assembly.

  6. Install the memory modules. See Install a memory module.

  7. Install the DIMM comb. See Install a DIMM comb.

  8. Install the cross braces. See Install the cross braces.

  9. Install the tray cover. See Install the tray cover.

  10. Install the tray into the enclosure. See Install a DWC tray in the enclosure.

  11. Connect all required external cables to the solution.
    Note
    Use extra force to connect QSFP cables to the solution.
  12. Check the power LED on each node to make sure it changes from fast blink to slow blink to indicate all nodes are ready to be powered on.