Skip to main content

Remove the manifold (in-rack system)

Follow the instructions to remove the manifold in an in-rack direct water cooling system.

About this task

Important

This task must be operated by trained technicians that are certified by Lenovo Service. Do not attempt to remove or install it without proper training and qualification.

CAUTION

The liquid might cause irritation to the skin and eyes. Avoid direct contact with the liquid.

S002
disconnect all power
CAUTION
The power-control button on the device and the power switch on the power supply do not turn off the electrical current supplied to the device. The device also might have more than one power cord. To remove all electrical current from the device, ensure that all power cords are disconnected from the power source.
S011
sharp edge
CAUTION
Sharp edges, corners, or joints nearby.
S038
Use eye protection
CAUTION
Eye protection should be worn for this procedure.
S040
use protective gloves
CAUTION
Protective gloves should be worn for this procedure.
S042
Danger
DANGER
danger
Risk of electric shock due to water or a water solution which is present in this product. Avoid working on or near energized equipment with wet hands or when spilled water is present.
Attention
  • Read Installation Guidelines and Safety inspection checklist to ensure that you work safely.

  • Power off the server and peripheral devices and disconnect the power cords and all external cables. See Power off the server.

  • Keep static-sensitive parts in their static-protective packages until installation to prevent exposure to static electricity. Handle the parts with an electrostatic-discharge wrist strap or other grounding systems. Place the parts on a static-protective surface.

  • Ensure proper handling procedures are followed when working with any chemically treated liquid used in the rack cooling system. Ensure that material safety data sheets (MSDS) and safety information are provided by the liquid chemical treatment supplier and that proper personal protective equipment (PPE) is available as recommended by the liquid chemical treatment supplier. Protective gloves and eyewear may be recommended as a precaution.

  • This task requires two or more people.

Procedure

  1. Power off the in-rack CDU and disconnect all power cords.
  2. Close both ball valves.
    Figure 1. Closing ball valves
    Closing ball valves

    1. Press the button on the ball valve switch.
    2. Rotate the switch to close the valves as illustrated above.
  3. Remove the quick connect plugs to separate the NeptCore module hoses from the manifold.
    Figure 2. Quick connect plug removal
    Quick connect plug removal

    1. Press the latch down to unlock the hose.
    2. Pull the hose off.
    3. Re-install the rubber quick connect plug covers to the ports on the manifold.
  4. Repeat 3 to the other manifold.
  5. Disengage the connection set from ball valves.
    Note
    Disengage the return side first, then disengage the supply side.
    Figure 3. Removing the connection set

    1. Rotate the ball valve to the left.
    2. Pull the connection set off from ball valve.
  6. Remove the return manifold with the connection set attached.
    Figure 4. Removing the manifold
    Removing the manifold

    1. Hold the manifold with both hands, and lift it upward to relocate the spools from the small openings to large ones on the rack cabinet.
    2. Remove the manifold with the connection set attached.
  7. Repeat 6 to the supply manifold.
    Note
  8. Install the bleeder kit to the manifold supply side.
    Note
    This step drains the liquid with the help of a pressure difference inside and outside the supply manifold.
    Figure 5. Installing the bleeder kit to the supply side
    Installing the bleeder kit on the supply side

    1. Remove the rubber quick connect plug covers from the ports on the manifold.
    2. Plug the bleeder kit to the manifold.
  9. Slowly open the bleeder valve to allow a steady stream of coolant to drain. Close the bleeder valve once coolant stops flowing.
    Figure 6. Opening the bleeder valve
    Opening the bleeder valve

  10. Install the bleeder kit to the manifold return side.
    Note
    This step drains the liquid with the help of a pressure difference inside and outside the return manifold.
    Figure 7. Installing the bleeder kit to the return side
    Installing the bleeder kit to the return side

    1. Remove the rubber quick connect plug covers from the ports on the manifold.
    2. Plug the bleeder kit to the manifold.
  11. Slowly open the bleeder valve to allow a steady stream of coolant to drain. Close the bleeder valve once coolant stops flowing.
    Figure 8. Opening the bleeder valve
    Opening the bleeder valve

  12. Separate the return manifold from the connection set in a dry and clean work area, and keep a bucket and absorbent cloths around to collect any liquid that may drain out.
    Figure 9. Separating the manifold from the connection set
    Separating the manifold from the connection set

    1 17 mm wrench
    1. Loosen the screw that locks the ferrule.
    2. Put the screw down.
    3. Open the clamp.
    4. Remove the ferrule and connection set from the manifold.
  13. Repeat 12 to the supply manifold.
  14. For better sanitation, keep the manifold ports and connection sets dry and clean. Re-install quick connect plug covers or any covers that protect connection sets and manifold ports.
  15. To remove the server from the rack, see Remove the server from the rack (friction rails) and Remove the server from the rack (slide rails).
  16. To remove the Processor NeptuneTM Core Module (NeptCore), see Remove the Lenovo Processor NeptuneTM Core Module.
After you finish

If you are instructed to return the component or optional device, follow all packaging instructions, and use any packaging materials for shipping that are supplied to you.