Install the front operator panel
Follow instruction in this section to install the front operator panel.
About this task
- Read Installation Guidelines and Safety inspection checklist to ensure that you work safely. 
- Power off the server and peripheral devices, disconnect the power cords from the primary chassis, then disconnect the power cords from the secondary chassis. See Power off the server. 
- Prevent exposure to static electricity, which might lead to system halt and loss of data, by keeping static-sensitive components in their static-protective packages until installation, and handling these devices with an electrostatic-discharge wrist strap or other grounding system. 
- If the server is installed in a rack, remove the server from the rack. See Remove the server from rails. 
- Go to Drivers and Software download website for ThinkSystem SR950 V3 to see the latest firmware and driver updates for your server. 
- Go to Update the firmware for more information on firmware updating tools. 
Procedure
After you finish
- For primary chassis only, reinstall the system I/O board and interposer assembly. See Install the system I/O board and interposer board. 
- For primary chassis only, reinstall the support bracket. See Install the support bracket. 
- Reinstall the upper processor board (CPU BD). See Install the upper processor board (CPU BD). 
- Reinstall the upper processor board (CPU BD) air baffle. See Install the upper processor board (CPU BD) air baffle. 
- Reinstall the front top cover. See Install the front top cover. 
Demo video


